7.0 KiB
Release Workflow
Table of Content
- 1. Preparations
- 2. Version
- 3. Changelog
- 4. Git Tag
- 5. Package Builds
- 6. Build Server
- 7. Release Tests
- 8. GitHub Release
- 9. Chocolatey
- 10. Post Release
Preparations
Specify the release version.
VERSION=2.9.0
Add your signing key to your Git configuration file, if not already there.
vim $HOME/.gitconfig
[user]
email = michael.friedrich@icinga.com
name = Michael Friedrich
signingkey = D14A1F16
Issues
Check issues at https://github.com/Icinga/icinga2
Backport Commits
For minor versions you need to manually backports any and all commits from the master branch which should be part of this release.
Authors
Update the .mailmap and AUTHORS files:
git checkout master
git log --use-mailmap | grep '^Author:' | cut -f2- -d' ' | sort | uniq > AUTHORS
Version
Update the version in the version file:
sed -i "s/Version: .*/Version: $VERSION/g" VERSION
Changelog
Update the CHANGELOG.md file.
Export these environment variables:
export ICINGA_GITHUB_AUTH_USERNAME='user'
export ICINGA_GITHUB_AUTH_TOKEN='token'
export ICINGA_GITHUB_PROJECT='icinga/icinga2'
Run the script which updates the CHANGELOG.md file.
./changelog.py
git diff
Git Tag
Major Releases: Commit these changes to the
master
branch.Minor Releases: Commit changes to the
support
branch.
git commit -v -a -m "Release version $VERSION"
Create a signed tag (tags/v) on the master
branch (for major
releases) or the support
branch (for minor releases).
git tag -s -m "Version $VERSION" v$VERSION
Push the tag:
git push --tags
For major releases: Create a new support
branch:
git checkout master
git checkout -b support/2.9
git push -u origin support/2.9
For minor releases: Push the support branch, cherry-pick the release commit into master and merge the support branch:
git push -u origin support/2.8
git checkout master
git cherry-pick support/2.8
git merge --strategy=ours support/2.8
git push origin master
Package Builds
RPM Packages
git clone git@github.com:icinga/rpm-icinga2.git && cd rpm-icinga2
Branch Workflow
Major releases are branched off master
.
git checkout master && git pull
Bugfix releases are created in the release
branch and later merged to master.
git checkout release && git pull
Release Commit
Set the Version
, Revision
and changelog
inside the spec file.
sed -i "s/Version: .*/Version: $VERSION/g" icinga2.spec
vim icinga2.spec
%changelog
* Tue Jul 17 2018 Michael Friedrich <michael.friedrich@icinga.com> 2.9.0-1
- Update to 2.9.0
git commit -av -m "Release 2.9.0-1"
git push
Note for major releases: Update release branch to latest.
git checkout release && git pull && git merge master && git push
Note for minor releases: Cherry-pick the release commit into master.
git checkout master && git pull && git cherry-pick release && git push
DEB Packages
git clone git@github.com:icinga/deb-icinga2.git && cd deb-icinga2
Branch Workflow
Major releases are branched off master
.
git checkout master && git pull
Bugfix releases are created in the release
branch and later merged to master.
git checkout release && git pull
Release Commit
Set the Version
, Revision
and changelog
inside the spec file.
./dch 2.9.0-1 "Update to 2.9.0"
git commit -av -m "Release 2.9.0-1"
git push
git commit -av -m "Release 2.9.0-1"
Note for major releases: Update release branch to latest.
git checkout release && git pull && git merge master && git push
Note for minor releases: Cherry-pick the release commit into master.
git checkout master && git pull && git cherry-pick release && git push
DEB with dch on macOS
docker run -v `pwd`:/mnt/packaging -ti ubuntu:xenial bash
apt-get update
apt-get install git ubuntu-dev-tools vim
cd /mnt/packaging
git config --global user.name "Michael Friedrich"
git config --global user.email "michael.friedrich@icinga.com"
./dch 2.9.0-1 "Update to 2.9.0"
Build Server
- Verify package build changes for this version.
- Test the snapshot packages for all distributions beforehand.
- Build the newly created Git tag for Debian/RHEL/SuSE.
- Build the newly created Git tag for Windows.
Release Tests
- Test DB IDO with MySQL and PostgreSQL.
- Provision the vagrant boxes and test the release packages.
- Test the setup wizard inside a Windows VM.
- Start a new docker container and install/run icinga2.
Example for CentOS7:
docker run -ti centos:latest bash
yum -y install https://packages.icinga.com/epel/icinga-rpm-release-7-latest.noarch.rpm
yum -y install icinga2
icinga2 daemon -C
GitHub Release
Create a new release for the newly created Git tag: https://github.com/Icinga/icinga2/releases
Chocolatey
Navigate to the git repository on your Windows box which already has chocolatey installed. Pull/checkout the release.
Create the nupkg package:
cpack
Install the created icinga2 package locally:
choco install icinga2 -version 2.9.0 -fdv "%cd%" -source "'%cd%;https://chocolatey.org/api/v2/'"
Upload the package to chocolatey.
Post Release
Online Documentation
Ask @bobapple to update the documentation at docs.icinga.com.
Announcement
- Create a new blog post on www.icinga.com/blog
- Social media: Twitter, Facebook, G+, Xing, LinkedIn
- Update IRC channel topic