9.0 KiB
Release Workflow
Table of Content
- 1. Preparations
- 2. Version
- 3. Changelog
- 4. Git Tag
- 5. Package Builds
- 6. Build Server
- 7. Release Tests
- 8. GitHub Release
- 9. Docker
- 10. Post Release
Preparations
Specify the release version.
VERSION=2.11.0
Add your signing key to your Git configuration file, if not already there.
vim $HOME/.gitconfig
[user]
email = michael.friedrich@icinga.com
name = Michael Friedrich
signingkey = D14A1F16
Issues
Check issues at https://github.com/Icinga/icinga2
Backport Commits
For minor versions you need to manually backports any and all commits from the master branch which should be part of this release.
Version
Update the version:
perl -pi -e "s/Version: .*/Version: $VERSION/g" VERSION
Changelog
Choose the most important issues and summarize them in multiple groups/paragraphs. Provide links to the mentioned issues/PRs. At the start include a link to the milestone's closed issues.
Git Tag
git commit -v -a -m "Release version $VERSION"
Create a signed tag (tags/v) on the master
branch (for major
releases) or the support
branch (for minor releases).
git tag -s -m "Version $VERSION" v$VERSION
Push the tag:
git push origin v$VERSION
For major releases: Create a new support
branch:
git checkout master
git push
git checkout -b support/2.12
git push -u origin support/2.12
Package Builds
mkdir $HOME/dev/icinga/packaging
cd $HOME/dev/icinga/packaging
RPM Packages
git clone git@git.icinga.com:packaging/rpm-icinga2.git && cd rpm-icinga2
DEB Packages
git clone git@git.icinga.com:packaging/deb-icinga2.git && cd deb-icinga2
Raspbian Packages
git clone git@git.icinga.com:packaging/raspbian-icinga2.git && cd raspbian-icinga2
Windows Packages
git clone git@git.icinga.com:packaging/windows-icinga2.git && cd windows-icinga2
Branch Workflow
For each support branch in this repo (e.g. support/2.12), there exists a corresponding branch in the packaging repos (e.g. 2.12). Each package revision is a tagged commit on these branches. When doing a major release, create the new branch, otherweise switch to the existing one.
Switch Build Type
Ensure that ICINGA_BUILD_TYPE
is set to release
in .gitlab-ci.yml
. This should only be necessary after creating a
new branch.
variables:
...
ICINGA_BUILD_TYPE: release
...
Commit the change.
git commit -av -m "Switch build type for 2.13"
RPM Release Preparations
Set the Version
, revision
and %changelog
inside the spec file:
perl -pi -e "s/Version:.*/Version: $VERSION/g" icinga2.spec
vim icinga2.spec
%changelog
* Thu Sep 19 2019 Michael Friedrich <michael.friedrich@icinga.com> 2.11.0-1
- Update to 2.11.0
DEB and Raspbian Release Preparations
Update file debian/changelog
and add at the beginning:
icinga2 (2.11.0-1) icinga; urgency=medium
* Release 2.11.0
-- Michael Friedrich <michael.friedrich@icinga.com> Thu, 19 Sep 2019 10:50:31 +0200
Windows Release Preparations
Update the file .gitlab-ci.yml
:
perl -pi -e "s/^ UPSTREAM_GIT_BRANCH: .*/ UPSTREAM_GIT_BRANCH: v$VERSION/g" .gitlab-ci.yml
perl -pi -e "s/^ ICINGA_FORCE_VERSION: .*/ ICINGA_FORCE_VERSION: v$VERSION/g" .gitlab-ci.yml
Release Commit
Commit the changes and push the branch.
git commit -av -m "Release $VERSION-1"
git push origin 2.11
GitLab will now build snapshot packages based on the tag v2.11.0
of Icinga 2.
Package Tests
In order to test the created packages you can download a job's artifacts:
Visit git.icinga.com
and navigate to the respective pipeline under CI / CD -> Pipelines
.
There click on the job you want to download packages from.
The job's output appears. On the right-hand sidebar you can browse its artifacts.
Once there, navigate to build/RPMS/noarch
where you'll find the packages.
Release Packages
To build release packages and upload them to packages.icinga.com tag the release commit and push it.
RPM/DEB/Raspbian:
git tag -s $VERSION-1 -m "Release v$VERSION-1"
git push origin $VERSION-1
Windows:
git tag -s $VERSION -m "Release v$VERSION"
git push origin $VERSION
Now cherry pick the release commit to master
so that the changes are transferred back to it.
Attention: Only the release commit. NOT the one switching the build type!
Build Infrastructure
https://git.icinga.com/packaging/rpm-icinga2/pipelines https://git.icinga.com/packaging/deb-icinga2/pipelines https://git.icinga.com/packaging/windows-icinga2/pipelines https://git.icinga.com/packaging/raspbian-icinga2/pipelines
- Verify package build changes for this version.
- Test the snapshot packages for all distributions beforehand.
Once the release repository tags are pushed, release builds are triggered and automatically published to packages.icinga.com
Release Tests
- Test DB IDO with MySQL and PostgreSQL.
- Provision the vagrant boxes and test the release packages.
- Test the setup wizard inside a Windows VM.
- Start a new docker container and install/run icinga2.
CentOS
docker run -ti centos:7 bash
yum -y install https://packages.icinga.com/epel/icinga-rpm-release-7-latest.noarch.rpm
yum -y install epel-release
yum -y install icinga2
icinga2 daemon -C
Ubuntu
docker run -ti ubuntu:bionic bash
apt-get update
apt-get -y install apt-transport-https wget gnupg
wget -O - https://packages.icinga.com/icinga.key | apt-key add -
. /etc/os-release; if [ ! -z ${UBUNTU_CODENAME+x} ]; then DIST="${UBUNTU_CODENAME}"; else DIST="$(lsb_release -c| awk '{print $2}')"; fi; \
echo "deb https://packages.icinga.com/ubuntu icinga-${DIST} main" > \
/etc/apt/sources.list.d/${DIST}-icinga.list
echo "deb-src https://packages.icinga.com/ubuntu icinga-${DIST} main" >> \
/etc/apt/sources.list.d/${DIST}-icinga.list
apt-get update
apt-get -y install icinga2
icinga2 daemon -C
GitHub Release
Create a new release for the newly created Git tag: https://github.com/Icinga/icinga2/releases
Hint: Choose tags, pick one to edit and make this a release. You can also create a draft release.
The release body should contain a short changelog, with links into the roadmap, changelog and blogpost.
Docker
Only for final versions (not for RCs).
Once the release has been published on GitHub, wait for its GitHub actions to complete.
VERSION=2.12.1
TAGS=(2.12)
#TAGS=(2.12 2 latest)
docker pull icinga/icinga2:$VERSION
for t in "${TAGS[@]}"; do
docker tag icinga/icinga2:$VERSION icinga/icinga2:$t
done
for t in "${TAGS[@]}"; do
docker push icinga/icinga2:$t
done
Post Release
Online Documentation
Only required for major releases.
Navigate to puppet-customer/icinga.git
and do the following steps:
Testing
git checkout testing && git pull
vim files/var/www/docs/config/icinga2-latest.yml
git commit -av -m "icinga-web: Update docs for Icinga 2"
git push
SSH into the webserver and do a manual Puppet dry run with the testing environment.
puppet agent -t --environment testing --noop
Once succeeded, continue with production deployment.
Production
git checkout master && git pull
git merge testing
git push
SSH into the webserver and do a manual Puppet run from the production environment (default).
puppet agent -t
Manual Generation
SSH into the webserver or ask @bobapple.
cd /usr/local/icinga-docs-tools && ./build-docs.rb -c /var/www/docs/config/icinga2-latest.yml
Announcement
- Create a new blog post on icinga.com/blog including a featured image
- Create a release topic on community.icinga.com
- Release email to net-tech & team
Project Management
- Add new minor version on GitHub.